BUILDING AND ZONING FEE SCHEDULE
Any person failing to obtain any of the below listed building permits, if required or if necessitated by the project, prior to commencement of construction shall be charged double the charge shown below for each required permit which the person failed to timely obtain.
Administrative Fees
| Category | Effective |
| Application Intake | $65 |
| Admin Fee | 15% of permit fees, minimum 7.50 |
| Contractor Change | $75 |
| Subcontractor Change | $40 |
| Permit Extension | Greater of $125 or 10% |
| Temp CO Residential | $150 |
| Temp CO Commercial | $300 |
| Special Event Permit | $100 (per Ordinance 2015-002) |
| State Surcharge DBPR | Per Florida Statute |
| State Surcharge DCA | Per Florida Statute |
Residential Permit
| Permit Type | Effective |
| New Single Family | $0.95/sf + trades $0.13/sf |
| Addition | $0.95/sf ($200 min) + trades $0.13/sf |
| Remodel / Alteration | $0.95/sf ($200 min) + trades $0.13/sf |
| Roof Replacement | $225 |
| Windows / Doors | $175 |
| Fence | $125 |
| Solar PV | $500 |
| Manufactured Home | $650 |
| Pool (Above Ground) | $300 |
| Pool (In-Ground) | $650 |
| Portal Spa | $50 |
| Demolition | $175 |
| Electrical | $175 |
| Mechanical | $175 |
| Plumbing | $175 |
| Gas | $175 |
| Irrigation | $175 |
| Driveway | $125 |
| Zoning Clearance | $50 |
| Building Accessory | $40 |
| Plan Review | Included (if private provider 15% reduction of permit fee) |
| Plan Re-review | $75 |
| Inspections | Included (if private provider 15% reduction of permit fee) |
Commercial Permit
| Permit Type | Effective |
| Commercial | $2.50/sf + trades $0.31/sf |
| Commercial Alteration | $2.50/sf + trades $0.31/sf |
| Roofing | $0.12/sf |
| Demolition | $350 |
| Electrical | $300 |
| Mechanical | $300 |
| Plumbing | $300 |
| Gas | $300 |
| Irrigation | $300 |
| PV Solar | $850 |
| Driveway | $250 |
| Fence | $125 |
| Zoning Clearance | $75 |
| Commercial Solar | $850 |
| Monument Sign | $450 |
| Change of Occupancy | $350 |
| Plan Review | 25% of Commercial Fees |
| Plan Re-review | $150 |
Inspection Fees
| Item | Effective |
| Re-inspection | $95 |
| Partial Inspection | $125 |
| After Hours | $60 per hour |
Floodplain Development
| Permit Type | Effective |
| Permit Application | $80 |
| Determination Letter | $30 |
| Consultant Charges | Actual Cost |
Private Provider Reduction for Commercial
| Service | Effective |
| Inspection Only | 25% reduction of permit fee |
| Plan Review Only | No Plan Review Cost |
| Inspection & Plan Review | 25% reduction of permit fee No Plan Review Cost |
Fire Fees
Fire Plan Review and Inspection Fees – Pass Through Fees – Not to be Split with City of Fruitland Park
| Permit Type | Effective |
| Fire Safety Review and Inspection | $4.75 per sq ft |
| Fire Development Review Fee | $250 per review up to 1 acre; $500 over 1 acre |
| Fire System Permit | $4.75 per sq ft |
| Fire System Plan Review | 1/2 of total Fire System Permit, minimum $75.00 |
PLANNING AND ZONING
Comprehensive plan amendment procedure
- (a) Application fee, per application: $300.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Annexations
- (a) Application fee, per application: $200.00
- Fee may be waived by city commission if annexation is requested by city.
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Zoning/rezoning procedure
- (a) Application fee, per application: $115.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Special exception and conditional uses
- (a) Application fee, per application: $200.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
PUD/public facilities district review procedure
- (a) Application fee, per application: $300.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Subdivision procedure fees
- (a) Application/preliminary plat approval, plus $5.00 per lot per application: $150.00
- (b) Advertising and mailing: Actual Cost
- (c) Final plat approval, plus $1.00 per lot per plat: $100.00
- (d) Subdivision on site inspection fee, plus $1.00 per lot per application: $100.00
- (e) Consultant charges: Actual Cost
Variance procedure fees
- (a) Application fee, per application: $100.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Vacation procedure
- (a) Application fee, per application: $100.00
- (b) Advertising and mailing: Actual Cost
- (c) Consultant charges: Actual Cost
Clearing permit
- Application fee, per application: $25.00
Tree removal permit
- Application fee, per application: $25.00
Site plans
- (a) Major (plus $4.00 per each 100 square feet of covered floor area in excess of 5,000 square feet): $250.00
- (b) Minor: $100.00
- (c) Consultant charges: Actual Cost
Construction plans
- Consultant charges: Actual Cost
Concurrency review
- Consultant charges: Actual Cost
Inspections
- Consultant charges: Actual Cost
Depending upon the nature of the development order requested, more than one fee may apply and be charged (e.g., an annexation fee plus a comprehensive plan amendment fee). In addition, fees other than those listed above may be charged to cover the cost of engineering and planning review necessitated by the application (e.g., Development of Regional Impact review fees, site inspection fees). Those additional fees shall be established between the city and the engineer and planner from time to time and charged to the applicant, based upon the fee schedule established. The actual cost of the consultant charges listed above shall be established from time to time by agreement between the city and the city's consultants. A list of the fees established shall be maintained by the city's building department.